How to install Cold Room,

How to install Cold Room,

Installation guide

Thank you for choosing Keskinso cooling for your cooling needs. cold room,your productsIt is guaranteed to provide years of excellent insulation to better protect it.

Yours for the most important.

Please read the instructions below on how to set up your modular room correctly.

1. What is a modular room?

Everyone is modularCold room not familiar with the concept.

Basically a modular cold room, its walls, ceiling and floor

consists of various sections or modules. These modules all fit together and interlock

put it in place by providing a thermally insulated and structurally sound chamber.

Bromic Cold Rooms 80mm thick modulesfrom the panels consists of.

Cold roomsPrepared shipped with panels.

refrigeration units cutting and/or drilling for insertion and pressure

Balancing valves are made by the installer.

2. Concept and advantages:

 The basic concept of Cold Rooms is in the size of the modules and

placement of interlocking cam mechanisms.

Our standard modular Cold Rooms can consist of ceiling and wall panels.

the following widths: 40cm, 80cm, 120cm. Floor panels are available in widths only

80cm ve 120cm.

The heights of standard wall panels are 200cm or 220cm.

All panels interlock with special cam locks that align and lock together.

It can be used as a cooler as well as freezers. or for temperatures

Below freezing the door must have a heating wire and this is called 'negative'.

door'. In addition, a pressure balancing valve must be Installed in one of the following.

The temperature change inside requires pressure equalization time.

 All of the Cold Rooms have 80mm thick floors.

3. Installation Requirements

Before you begin, make sure there is enough space for room assembly.

Make sure that the electrical connection cable to be given to the cold room is ready and the installation surface is flat and level.

3.1 Power Requirements

Power requirements vary with different room sizes and between refrigeration and freezer.

A general usecold room The cooling system chosen by Keskinso Cooling for

Replacing or replacing this unit could potentially change its power requirements.

3.2 Room Size

Note that all room sizes listed are internal.

To calculate this, you must add the dimensions as well as the width and length dimensions.

height and base spacers to determine height.

Example: There will be a Cold Room 2.6 m long x 2.6 m wide x 2.2 m high…

4. Parts and Accessories

Ceiling and wall panels playmut floor panels Swing door chiller group interior and exterior accessories screw Rivet silicone polyurethane cable etc.

How to install cold storage,

After making sure that you have the required space for the installation and all processes are completed

To start the actual installation process.

5.1 Floor Panels

The floor panels are made by squeezing 42's site poleten between the plymot and six sheet metals. Play Playwood side up.

.

• Thickness of floor panels: 80cm 100cm, 120cm, 150cm, 180cm and 200cm.

• Their width is always 111 centimeters.

5.2 Installation of floor panels

Position the floor panels according to the room's aspect.

 According to the thickness of the panel, mount the u plate and the floor in the form of a dowel screw.

Take the Allen key and insert it into the camlock hole to lock the floor panels together

place it on the coated side of the floor and turn it approximately 45° clockwise. Stop squeezing right away

After putting all the floor panels in place and locking them together,

You can now lock the panels together by snapping the wall panels into the floor corners.

When we get to the door point, put the door back and lock it with Cam locks.

 When the entire wall and door is finished, lock it by putting it on the ceiling panels in the same way.

 In the meantime, after the installation of the inner accessories and the installation of the outer accessories, fill all the connection points and the edges of the accessories with silicone, which has a sealing feature, symmetrically.

Next Water Drain drainage line After punching the cooling system copper pipe and wiring line places with Punch, we can now mount the evaporator system to the ceiling and pull our installations so that the cables pass through the punch hole.

We complete the assembly of our connection pipes and cables, paying attention to the fact that our chiller, which we put outside, is in a good place.

By mounting our digital device to have a good viewing angle next to the door, we make the control connections from here, and the assembly is completed by attaching our interior lighting lamp.

 We have completed the assembly of our cold room. Now, after we go out again and make sure that our cooling group is ready for vacuum, we attach our manometer to the vacuum device and keep the system waiting to ensure that there is a good vacuum.

After the vacuum and leak tests, we make the 404 a ready, after we put a certain amount, we start our compressor device and make our residual gas charge to its normal dimensions, and then we close the stuffing valve and complete the charge.

 We introduce and inform our customer how to use our cold room, which has become operational.